Begin with the roof valleys.
Furring strip spacing for metal roof.
Always place fasteners in the flat of the metal roofing.
If you opt to put the metal roof atop current roof shingles it needs to be done in combination with a synthetic underlayment recommended.
Of course with metal shingles as opposed to panel roofing the mounting or engagement strip if used or shingles if no mounting strip should lie flat on the water barrier or bridge across up and down slope firring strips at the manufacturer specified spacing.
Use a tool belt that has a hammer loop to hold nails a measuring tape chalk line and a hammer when installing the wood.
Create a chalk map.
Place corner pieces where panels will meet bends at the edge of the roofing.
This should then be followed up with galvanized steel hat channel preferred method or 1 x 2 furring strips.
Make sure that the wood strips are the right.
Make chalk marks along the side of the valley about an inch fro the.
Screw fasten the purlins using fasteners directly screwed into the trusses or rafters.
Use 1 1 4 inch nails to cover the outline of the roof with strips of metal eave flashing also called edging.
Experienced do it yourselfers can use a nail gun with 8d nail clips instead of a hammer and nails.
Place the primary furring strips.
When re roofing a shingle roof with metal do not install the metal roofing directly on a shingle roof.
Installing furring strips for metal roofing.
If there are gutters installed on the eaves the eave flashing should be installed to overhang the lip of the gutter by about 1 2 inch.
How do you install furring strips on a metal roof.